Enter the treatment plan sentinel dates on this page at various points through the cycle.
For further information on this, click here
The Treatment plan tab lists the sentinel dates for the current treatment. Fill in these dates as the treatment progresses and use the ‘lab events’ section . For more detailed information click here Tx cycle - Treatment plan tab & sentinel dates and here Tx Cycle Management - Entering Sentinel Dates .
Filed on treatment plan tab | Notes on filling this field |
|
---|---|---|
Treatment plan assigned |
| This is the date the treatment plan was created. Usually the date the intended treatment record is created. |
Baseline scan | directly entered from Treatment Plan tab | This is the date the baseline scan is done or scheduled to be done. |
Menstrual day 1 before down-regulation | directly entered from Treatment Plan tab | This is the date of her first day of bleeding preceding her treatment with down-regulation drugs. This is usually the month before stimulation drugs are given. |
Start date of stimulation medications | directly entered from Treatment Plan tab | This date is the first day that stimulation medications are administered. For most reporting agencies, this date is the 'start of treatment' for reporting purposes |
Start of follicular phase (LMP) |
| Typically the date the patient begins their stimulation (eg. start date of FSH in IVF cycle or HRT in FET cycle) or is the LMP in a CC or natural cycle. This is considered the Cycle Start Date. |
LH surge / P4 administration |
| This date (and time) is filled in when drugs are used to convert a cycle from the follicular phase to the luteal phase. Typically this is done in frozen embryo, donor egg/embryo and surrogate treatments. This box is filled in when the patient either has a natural surge or P4 administration begins. Please note: |
LH surge date P4 administration |
| You may enter the surge date if HCG is not used to trigger ovulation in the cycle. P4 would be used in an FET cycle |
Date of trigger | Populates when confirmed in the detail of the plan, in the 'Plan Details tab | Date & time of HCG administration |
Luteal day 0;
| autofilled once trigger or LH surge date is entered | The egg retrieval or ovulation date. IDEAS will automatically calculate the date of Luteal day 0 based on the date of trigger (above) and auto-fill this date. However, the Luteal day 0 date can be manually adjusted by overwriting the date. This date is automatically filled in when the date of trigger is entered. However, it should be manually entered in treatments where there is an LH surge or when progesterone has been administered. In an appropriately designed treatment plan the luteal day 0 will be automatically filled out based on the date that progesterone administration is begun (eg. If P4 begins on Luteal day -2 in the treatment plan, then luteal day 0 would be calculated to be 2 days after the date of P4 administration.). Please note: |
Egg retrieval and embryo transfer date ;
| Autofilled from dates recorded in the lab events folder | Note - lab events can only be entered once the luteal day 0 is entered Transfer date is determined based on the relative luteal day of the transfer event in the Plan Details tab. This is the date of egg collection for fresh IVF treatment or IVM cycles. IDEAS will enter this date for you once the corresponding laboratory event has been completed.
|
Thaw date | Autofilled from dates recorded in the lab events folder There may be a planned date here if you have a thaw included in your treatment plan | This is the date on which embryos or eggs are thawed. If further eggs or embryos are thawed, only the first thaw date is recorded although the second thaw event is recorded within the laboratory records. |
Pregnancy test | This can be autofilled by including a pregnancy test in your treatment plan, or directly entered | This is the date of the first luteal phase pregnancy test. The interpretation can be Pregnant or Not pregnant and will be automatically filled in when the first luteal ß hCG is entered into Blood/Lab tests. This field should be entered for all treatments once the outcome is known as other functions within IDEAS are dependent on this information. |
Clinical pregnancy date | Autofilled from gestational scan record which records a clinical pregnancy | This is the date recorded inthe of the first gestational ultrasound scan which confirms the clinical status of the pregnancy. |
Estimated delivery date | Autofilled when a clinical pregnancy date is completed | When a pregnancy has been established, IDEAS calculates the estimated date of delivery and auto-fills this field. |
Sentinel dates are entered on the Treatment Plan tab. You have the option to enter these initially as planned or estimated dates.
If the LMP (last menstrual period) date is known, click "Set date" next to Menstrual day before downreg
enter the LMP.
You can enter today's date by typing 't' into a date field and then pressing Enter. Double clicking any date field will open up a Calendar to select the date from.
Estimated dates
Estimated dates can be entered by pressing the "Plan dates" box next to Egg collection or Embryo transfer dates
Once saved, estimated dates will be represented by a ~ before the date.
If you plan on using estimated dates in your treatment plans please discuss with Mellowood Medical Support the best way to design your treatment plans. There are various configuration options that can be added to treatment plans to allow you to best use this feature within IDEAS.
Treatment plans will require editing as the patient moves through their treatment cycle - for help on this click here Tx Cycle M/ment - Plan details tab - adding, deleting or editing events .
For information on the ‘Events’ section click here Events section on Treatment Plan tab
For more information on the other tabs in the treatment cycle folder follow these links;
Version | Date | Comment |
---|---|---|
Current Version (v. 7) | Jul 26, 2023 08:42 | Mhairi West |
v. 6 | Jul 26, 2023 08:31 |
Mhairi West
added detaikl to all sections and links to treatment and cycle outcome pages |
v. 5 | Aug 08, 2022 11:18 | Mhairi West |
v. 4 | Aug 08, 2022 11:16 | Mhairi West |
v. 3 | Nov 16, 2021 16:45 | Mhairi West |
v. 2 | Nov 16, 2021 16:42 | Mhairi West |
v. 1 | Nov 16, 2021 16:20 | Mhairi West |